What is JacketFlap

  • JacketFlap connects you to the work of more than 200,000 authors, illustrators, publishers and other creators of books for Children and Young Adults. The site is updated daily with information about every book, author, illustrator, and publisher in the children's / young adult book industry. Members include published authors and illustrators, librarians, agents, editors, publicists, booksellers, publishers and fans.
    Join now (it's free).

Sort Blog Posts

Sort Posts by:

  • in
    from   

Suggest a Blog

Enter a Blog's Feed URL below and click Submit:

Most Commented Posts

In the past 7 days

Recent Posts

(tagged with 'Joseph Kevin Villagomez')

Recent Comments

Recently Viewed

JacketFlap Sponsors

Spread the word about books.
Put this Widget on your blog!
  • Powered by JacketFlap.com

Are you a book Publisher?
Learn about Widgets now!

Advertise on JacketFlap

MyJacketFlap Blogs

  • Login or Register for free to create your own customized page of blog posts from your favorite blogs. You can also add blogs by clicking the "Add to MyJacketFlap" links next to the blog name in each post.

Blog Posts by Tag

In the past 7 days

Blog Posts by Date

Click days in this calendar to see posts by day or month
new posts in all blogs
Viewing: Blog Posts Tagged with: Joseph Kevin Villagomez, Most Recent at Top [Help]
Results 1 - 1 of 1
1. CNMI's Dialysis Center

We're supposed to have a new dialysis center at the Commonwealth Health Center. With all of the change orders, it appears that about $22 million dollars of federal and CNMI money was spent building it.


Photo from of CNMI Public Auditor's 2007 Report.

But what we have is a structure that is "built" but not used for dialysis because it is unsafe. The Variety reports today that CNMI Secretary of Public Health Joseph Kevin Villagomez signed off on the project, certifying that the structure was acceptable because of instructions from the "facilities engineer." Who was that facilities engineer? The newspapers don't say.

Joe Kevin Villagomez's role in signing off, though, is being questioned. Shouldn't he have also exercised independent professional judgment?

The problems reported with the new facility:
1. The reverse osmosis (RO) system contains bacteria.
2. The water storage tanks of the reverse osmosis system may be carbon media tanks, not multi-media tanks. Labels on the tanks were changed to disguise the flaw.
3. There is a suspicion of irregularities in materials used in construction: PVC fittings and pipes of the RO system were glued so that excessive glue flaked into the system and would subject patients to possible harm.
4. Public Health officials has told lawmakers that the dialysis center's certification for the RO system was forged.
5. The CNMI sued the contractor Leo A. Daly Company for defective design, and have alleged the facility is useless for its intended purpose. (This lawsuit is only for $10 million, though.) One of the alleged defects (reported in August 15, 2009 Tribune article) is failure to meet stress tests for earthquakes.

And we don't have staff for it.

The CNMI Legislature recently convened two public hearings on the delivery of health services in the CNMI. The House Committee on Health, Education, and Welfare (HEW) invited public health and private doctors to a daytime session, but no one came, according to the today's Saipan Tribune. In contast, the public hearing in the evening, open to the public, drew a small group of about 30 people.


Photo from CNMI Public Auditor's 2007 Report.
What I find interesting is the focus of the hearing: reported as a look at hiring doctors and the necessity of paying for head hunters. Perhaps it's an issue with reporting, but we certainly have much more serious problems than paying head hunters to find us doctors (even at $25,000 / doctor).

In a recent survey, several major problems at CHC were noted, including mismanagement, poor procurement practices, and inadequate billing/accounting and records procedures, along with a doctor shortage.

In Tuesday's KSPN news, Ralph Torres made some remarks that seem unclear: yes he wants to find an experienced person to handle the situation at DPH, and yes, joe Kevin Villagomez has experience. It's not clear to me whether he thinks joe Kevin would be up to the job, but for his health issues that have made him leave island for months now; or whether he was acknowledging that "experience" comes in different varieties and needs to be scrutinized, too.

It's not clear if he just does't like Pete Untalan, either. He reported that Pete said the dialysis center would be open in August and here it is September; but the August 15, 2009 Tribune has Pete saying it will be open in October, with a nephrologist due to arrive on September 23, 2009.

And think of all the earlier times when we've heard that the dialysis center will be opened!

I guess we need Legislative oversight of administration functions; but we also need to recognize that the Legislature's job is making laws, not carrying them out. It's unrealistic to expect the Legislature to take over this problem and fix it. Especially, when you consider that the Legislature's often repeated "solution" is to throw money at the problem, as Ralph Torres says we need to do here.

Nor is the Legislature to be relied on to get things done promptly. They've known about the problems with the dialysis center since at least September 2003, as this flashback from September 2, 2003 shows. The Legislature is a political body that changes with seasonal voting. They get involved with hot topics, but also can cool off before the work is finished.

What do we need to do?

I think we need to start at the beginning and review all that's been done.

So here's a summary of the history of the CNMI Saipan dialysis center, as taken from the newspapers (note, Haidee does a similar thing, in summer 2009, and the link is later, but rather than re-writing and analyzing, yet, I'm just giving the blow-by-blow):

1999-10-28:


"The California-based Transpacific Renal Network has given recognition to the renal hemodialysis section of the Commonwealth Health Center as one of the top units that provide quality care to patients undergoing dialysis.

Public Health Secretary Joseph Kevin Villagomez said such accomplishment shows the commitment of the hospital in making sure that the best possible care is provided to the people in the community....Dr. Hilmer Negrete, director of hemodialysis unit of CHC, said the team has to submit regular progress report to each patient undergoing dialysis treatment to Transpacific Network."


2000-03-06: 51 dialysis patients costing $5 million / year.

2001-09-07: In 2001, we have 2 nephrologists--Dr. Negrete and Dr. Zahid.

2002-06-11: Rota and Tinian to get dialysis centers at $1million apiece.


“We found out that, if you build a structure and the structure is certified by Medicare, then at least 80 percent of the operational funds will come directly from the Medicare and that is the federal funding we are eyeing. So, to ensure that we can tap these funds, we will make sure that the buildings for the dialysis centers are Medicare-certified,” he said.

Earlier, lower chamber lawmakers said that Rota and Tinian dialysis patients are presently inconvenienced by the need to travel to Saipan, the location of the nearest CNMI dialysis center, to receive treatment.

“Responding to the needs of dialysis patients in Rota and Tinian requires the construction of dialysis centers on these islands. By using the un-appropriated Public Law 12-64 funds on Rota and Tinian, patients need not make the arduous trip to Saipan to avail themselves of dialysis care,” said House Floor Leader Jesus T. Attao, the bill's author.

As broken down in the proposed measure, $1 million would go toward a new Department of Public Health Building and Dialysis Center on Rota and another $1 million for a similar building on Tinian.


2002-08-28: Saipan to get dialysis center; this project is estimated to cost $5.6 million.


"On the Department of Public Health building expansion, this will entail the construction of the extension that would house 24 to 25 new dialysis machine units at the CHC.

Bids for the project were received in April and a contractor has already been selected and notified that it would be awarded the project. However, a notice to proceed has yet to be issued pending the release of several construction permits.

“The government has been applying for the building permits and all the permits necessary to start the project, rather than have the contractor obtain the permits, to eliminate unnecessary delays in the project,” said Jordan."


2002-10-26. Project finally underway. Estimated cost for project between $5 and $6 million. Dr. Hofschneider as DPH secretary. Estimated completion date: 4/18/2004. Current situation: 90 patients.



Hofschneider said the project's contractor is AIC Marianas Incorporated, while the construction management contract has been awarded to SSFM, whose principal is John Gentry and whose fee is about $250,000... Jordan said the DPW released the Notice to Proceed to the contractor last Tuesday and the expansion project is expected to be finished in 540 days, with some additions and deletions to be made on the project.



... Although the budget for the project is between $5 and $6 million, Hofschneider expressed hope that some money would be left to be used as additional funding for the water needs of the building, parking and a new MSO building. This (sic) related projects are estimated to cost $4 million.


Note--this is going to lead to problems later.

2002-11-08: CNMI Government (through Chuck Jordan), keeping track of CIP projects including the dialysis center (CHC expansion) project.

2003-02-07. Groundbreaking for the dialysis center/CHC expansion project. Cost now estimated at $10 million. 93 dialysis patients. Estimated opening of new facility-2 years. That would be early 2005.

2003-06-10. CNMI starts new program for peritoneal dialysis. Now 96 patients.

2003-09-02. Problems about design noted. Change orders being sought. It appears that the issues are the inclusion of improved water system and parking lot, which were not part of the original plan.

What did I mention up above?

2004-01-31. Construction of dialysis center is on schedule, despite some design problems.

2004-03-04. Hofschneider asks U.S. Congress to provide $1.1 million to buy equipment for new dialysis center. Says CNMI only budgeted for building the facility, not equipping it.

2004-10-22. Kagman wastewater project funds reprogrammed to dialysis center.

2004-10-29. CNMI Congress considers reprogramming request; wants assurances. Information confusing; Leo Daly out-Tanuguchi Ruth in.

2004-11-02. Joint House and Senate Committee to probe dialysis center construction issues; Governor Fitial asks for Public Auditor's office examination, also. This article says $11 million given from Covenant 702 funds. Project 40% complete.

2004-12-24. Did we really pay $50,000 to the U.S. Army Corps of Engineers to review the construction of the dialysis center? Stanley Torres says so. Where is the Army Corps of Engineers report?

... And then this recap of the finances:


The reprogramming bill came following findings that the public health project's over $11-million funding had been depleted, even as construction work was only about 40 percent completed.

Originally, the government allotted some $11.8 million in Capital Improvement Project funds for the dialysis center. Of that amount, the Department of Public Health awarded a $5.6-million contract to AIC Marianas to construct the facility.

The contractor had repeatedly asked for change orders, totaling over $4 million, allegedly due to faulty design. About $2 million had been spent for two architectural and engineering designs, while other expenses reportedly went to administrative activities.


2005-08-03. In the meantime, CHC gets a few more dialysis stations.

2005-09-18. Also meanwhile, the CNMI provides competent care and exceeds average U.S. standards, according to Dr. Zahid. Good data here.

2006-02-04. Governor Fitial's administration asks for reprogramming of more funds for dialysis center. Project now 70% completed.

2006-04-11. DPH Secretary Joe Kevin Villagomez says dialysis center will open in October 2006.


“It's going very well. There's a lot of involvement in this project,” he said, adding that there would be medical staff that would be assigned to the new building.


2006-07-07. Dialysis center to be named after Dr. V. (It helps when you're the lieutenant governor and get to sign the law naming the facility after your father.)

2006-07-28. Opening delayed to November 2006, to secure Medicare certification.

2006-10-18. Cost of dialysis center now said to be $15 million. Joe Kevin Villagomez enlists political support, like this:


“Our money was well spent,” Rep. Manuel Tenorio said.


2006-10-19. The new building is used as bait to seek more funding for CHC! See, we did a great job and now need to upgrade the rest of the old building... or something like that.

2007-06-08. Inspector General's Report identifies management issues with the dialysis center project.

2007-07-11. Joe Kevin Villagomez says we should privatize the dialysis center building; it's still not open. (This sounds like a scam to me--some way to get a private business some additional cash at government expense.)

2007-10-05. Both CNMI nephrologists have recently left the CNMI; a Guam doctor will be visiting.

2007-12-20. Ribbon cutting and new dialysis center officially opens. Umm, does it?

2007 Public Auditor's Report at page 6 says this:


A joint evaluation of the Saipan Public Health Facility Project (Project) by the Department of the Interiors' Office of the Inspector General (OIG) and OPA showed serious deficiencies in the contracting process, including the failure to adhere to established procurement regulations and the lack of qualified and experienced officials to administer the Capital Improvement Project (CIP) program, which significantly affected construction costs and time frames.


2008-01-26. CNMI spending $8.8 million /year for 96 dialysis patients.

2008-02-07. Children's Clinic and immunizations moved to new dialysis center wing.

2009-05-18. CNMI once again without a nephrologist. Other concerns about CHC raised by Ed Propst.

2009-05-19: Untalan responds: Those concerns are just one person's opinion; Diabetes Prevention Program still operational.


In a recent letter by Rep. Ralph DLG. Torres to DPH Secretary Kevin Villagomez, the former asked for some information on several matters at the CHC.

These include updates on the status of nephrology, updates on dialysis machines to be replaced, local expenditure for Fiscal Year 2009, data as to the number of dialysis patients, the status of the Hemodialysis Center and other issues.

A copy of the letter was sent to Saipan Tribune. Secretary Villagomez has yet to respond to e-mail inquiries about it.


2009-05-23. Legislator asks for information from Secretary of DPH. See, the Tribune does read the letters submitted!

2009-06-06. FDA Certification for dialysis center forged. Information revealed in BUDGET HEARING!


Acting Health Secretary Pete T. Untalan told the House Ways and Means Committee yesterday that the U.S. Food and Drug Administration certification of the reverse osmosis water system at the new dialysis center was “forged” by an individual previously connected with the U.S.-based Severn Trent.

Severn Trent supplied the reverse osmosis water system unit to Saipan Ice, which was one of the subcontractors of AIC Marianas, the main contractor for the construction of the new dialysis building in Garapan.

Saipan Ice's sales supervisor Lito Dizon and AIC Marianas project engineer Ding Lacap separately said in telephone interviews that they're not aware of the forgery and that nobody had told them about the issues that just came about.

Medicare requires the CNMI Department of Public Health to have an FDA-certified reverse osmosis water system for it to operate the new dialysis center, which has yet to open three years after its construction was completed in 2006.

“We found out just a few days ago that the reverse osmosis system is not FDA-certified,” Untalan told the legislative committee chaired by Rep. Ray N. Yumul (R-Saipan) during yesterday's hearing on DPH's Fiscal Year 2010 budget.


(This certification is needed for Medicare approval. Why did it take this long to figure this out? Weren't we seeking Medicare approval back in 2007?)

2009-06-08. Cost for dialysis center now reported at $22 million.

2009-06-09. CNMI Legislature to ask Public Auditor to investigate.
Have they read the existing OIG report or the OPA's 2007 report?

2009-06-12. CNMI to sue over $22 million "fiasco." Good review of situation here.

2009-06-16. The local newspapers finally catch up to the 2007 OIG/OPA report.

2009-06-16. Matt Gregory, former CNMI AG, now files suit as a private attorney against Leo Daly for $10 million on behalf of the CNMI.

We have an Attorney General's Office, but we use a private firm for this. Why? Oh, because the OAG is understaffed. But why not use the money and hire another Assistant Attorney General instead of paying private attorney rate fees? (OMG!)

In my opinion, Gregory should have brought this action while he was the CNMI AG. And his failure to do it then should be reason enough NOT to hire him and pay him more money to do it now.

2009-06-17. Haidee Eugenio continues to dig for the full story.

2009-06-19. The CNMI is not pursuing criminal charges for the dialysis center fiasco. And Juan Reyes at DPW identified as the "expenditure authority" (for at least some of the time? or all of the time?).

2009-07-21. Representative Ralph Torres says we'll have one full-time nephrologist for Saipan/CNMI next month (August 2009).

2009-08-15. Grand opening of dialysis center set for October 2009. It will be old before it is in use!

2009-09-19. Pete Reyes and Arnold Palacios think we need a law establishing a "corporation" as the solution!


The lawmakers said a bill establishing a corporation for public healthcare and related public health services will in the long-term provide a foundation for a high quality, efficient and market-oriented public healthcare delivery system.


Without any analytical basis; without reference to the real studies of the problems done; without regard to the problems we've had from corporations like MPLC. How is a corporate structure going to address the problems! Sheesh. Just like privatizing seems to be a method for economic graft, this is nothing but political graft--imho.

Somewhere in all of this was a report that there were three contractors/project designers(?) involved--Leo Daly, Tanaguchi Ruth, and an unnamed third. Who is the third contractor? Perhaps I missed that information somehow.

Where do we go from here?

16 Comments on CNMI's Dialysis Center, last added: 9/25/2009
Display Comments Add a Comment